Would You Take This Job? – Senior Technical Analyst (GIS) at Southwire

Job Title: Senior Technical Analyst
Company: Southwire
Location: U.S. (specific location not listed)
Type: Full-time
Salary: Not listed

Requirements:

  • Experience with GIS systems and data integration

  • Ability to collaborate with cross-functional teams (engineering, operations, IT)

  • Knowledge of Outage Management Systems, AMI, and related utilities data platforms

  • Strong technical and analytical skills

  • Background in systems analysis or GIS-related roles preferred

Responsibilities:

  • Integrate and analyze data from GIS, AMI, Outage Management, and Work Management Systems

  • Provide technical support for system improvements and troubleshooting

  • Collaborate with teams to enhance operational efficiency through GIS data use

  • Ensure accuracy, consistency, and security of data across platforms

Click here for more job details and a link to apply.


Would You Take It?

This role is a strong fit for someone with GIS expertise who wants to apply it to utility and infrastructure operations. It promises complex, impactful work—but with the challenge of managing data integration across multiple technical systems.

Would you take this job? Why or why not?

I’d ask if they’re on Esri Utility Network yet and how they reconcile AMI last-gasp events with OMS outages. In my last project, 8% of meters were misassigned to the wrong transformer, and fixing the meter-to-transformer mapping (with a single data owner and nightly validation) cut false outages by half.

‍‌‌⁠‍‌​‍‍⁠​​​‍‌‍‍‍‍⁠⁠‍‍‌‌‍‍⁠​‍‍‌​⁠​‌​‍‌‍‍‌⁠‌⁠‍‍‌‍​‌⁠‍‌​‍‌⁠‌‍​‍‌‍⁠‍​‍‍‍⁠​‍​⁠​‌⁠⁠‍​⁠‌‌​‍‌‍‍‌⁠‌⁠‍‍‌‍​‌‌‌⁠‌​‌‍‍‌​⁠⁠‍‍‍‌‍‌⁠‍​​⁠‍⁠‍‍‍‍⁠⁠​⁠​‍‌‍⁠‌‌​‌‍‍‌​⁠⁠‍‍‌​‍‌⁠‍‌​⁠‌​‌​​‍‌⁠​‌​⁠‌​‌​‍‍⁠⁠‍​​⁠‍‍‍‌​‍‌⁠​⁠​‍‌‍⁠‌‍‌⁠‍‍‌​⁠⁠‍‍‌​‍‍‍⁠⁠‍​‌​‌⁠⁠​‌⁠‌⁠‍‌‌​‌‍‌‌‍‍⁠‍​⁠‌‍⁠​​⁠‍⁠​‌​⁠⁠‌‌​‌‌‍​‍⁠‌‌​​‌‌⁠​‌‍⁠‍​‍‌‍⁠‍⁠​​

I’d bite if they’re funding UN↔OMS/AMI cleanup and real data governance. At my last utility we cut false outages about 18% by reparenting service points and automating last‑gasp vs SCADA checks with FME, but it only stuck with a DQ SLA and protected cleanup time — what’s their stack (OMS vendor, UN status), remote/hybrid, and on‑call?

‍‌‌⁠‍‌​‍‍⁠​​​‍‌‍‍‍‍⁠⁠‍‍‌‌‍‍⁠​‍‍‌​⁠​‌​‍‌‍‍‌⁠‌⁠‍‍‌‍​‌⁠‍‌​‍‌⁠‌‍​‍‌‍⁠‍​‍‍‍⁠​‍​⁠​‌⁠⁠‍​⁠‌‌​‍‌‍‍‌⁠‌⁠‍‍‌‍​‌‌‌⁠‌​‌‍‍‌​⁠⁠‍‍‍‌‍‌⁠‍​​⁠‍⁠‍‍‍‍⁠⁠​⁠​‍‌‍⁠‌‌​‌‍‍‌​⁠⁠‍‍‌​‍‌⁠‍‌​⁠‌​‌​​‍‌⁠​‌​⁠‌​‌​‍‍⁠⁠‍​​⁠‍⁠‍‌​‍‌⁠​⁠​‍‌‍⁠‌‍‌⁠‍‍‌​⁠⁠‍‍‌​‍‍​‌⁠‌‌⁠‍⁠​​‍‍⁠‍​​⁠‍​​⁠⁠​‌‌‌​‍​‌‍⁠‌⁠‍‌⁠‌​‌‌‍‌‌‍​‍‍‌‌​​⁠⁠‌‌‍‌​‍‌‍‍​‍‌‍⁠‍⁠​​